RTS Finland
Data stock: PUBLIC [ Download ]

Process data set overview page

Data set: Arcwood - GLULAM (00.03.000)

Full name
Arcwood - GLULAM
Location
EE
Reference year
2022
Valid until
2027
Reference flow(s)
Type
EPD
Parameterized?
no
LCIA results included?
yes
Category
Synonyms
Use advice for data set
The scope of the EPD is cradle to gate with options, modules C1- C4 and module D. Included are A1 (Raw material supply), A2 (Transport) and A3 (Manufacturing), A4 (Transport), A5 (Assembly) as well as C1 (Deconstruction), C2 (Transport at end-of-life), C3 (Waste processing), C4 (Disposal) and module D - benefits and loads beyond the system boundary is included.
Data set use approval
General comment
Allocation is required if some material, energy, and waste data cannot be measured separately for the product under investigation. In this study, as per EN 15804, allocation is conducted in the following order; 1. Allocation should be avoided. 2. Allocation should be based on physical properties (e.g. mass, volume) when the difference in revenue is small. 3. Allocation should be based on economic values. Module A1 includes allocation for co-products. Allocation has been done based on economic values as the Products and co-products share of revenue differs greatly. Allocation used in Ecoinvent 3.6 environmental data sources follows the methodology ‘allocation, cut-off by classification’. This methodology is in line with the requirements of the EN 15804 - standard. This LCA study is conducted in accordance with all methodological considerations, such as performance, system boundaries, data quality, allocation procedures, and decision rules to evaluate inputs and outputs. All estimations and assumptions are given below: • Module A2, A4 & C2 Vehicle capacity utilization volume factor is assumed to be 1 which means full load. In reality, it may vary but as role of transportation emission in total results is small and so the variety in load is assumed to be negligible. Empty returns are not taken into account as it is assumed that return trip is used by transportation company to serve the needs of other clients. • Module A3 Waste wood used for drying kilns was allocated based on share of wet wood used for each Product. All other energy use and waste was allocated based on production volume. • Module A4 The transportation distance is defined according to RTS PCR. The typical installation place was assumed as an average option. According to the manufacturer, transportation doesn’t cause losses as products are packaged properly. Also, volume capacity utilisation factor is assumed to be 1 for the nested packaged products. • Module A5 Consumption of energy in installation process are assumed to be 38 MJ of diesel per m3 of CLT and glulam. Metal fasteners are assumed to be used in the amount of 4.5 kg (CLT), 16.5 kg (glulam) and 4 kg (finger-jointed structural timber) per 1 m3. • Module C1 Consumption of energy in demolition process is assumed to be 38 MJ of diesel per m3 of product. It is assumed that 100% of the waste is collected. Fasteners are excluded. • Module C2 It is estimated that there is no mass loss during the use of the product, therefore the end-of-life product is assumed to have the same weight with the declared product. All of the end-of-life product is assumed to be collected as sorted wood waste or mixed construction waste and sent to the closest facilities such as recycling and landfill. Transportation distance to the closest disposal area is estimated as 250 km and the transportation method is assumed as lorry, which is the most common option. • Module C3 97% of the sorted wood waste is recycled. Losses in the sorting process are assumed to be very small and not considered in the assessment. • Module C4 The remaining 3% of the sorted wood and 100% of the mixed construction waste are assumed to be sent to landfill. • Module D Benefits of recyclable waste generated in the Module C3 are considered. It was assumed that 47.49% of the sorted wood waste is incinerated and 49.47% is recycled to be used again (for example, to produce fibreboard). The study does not exclude any modules or processes which are stated mandatory in the EN 15804:2012+A2:2019 and the applied PCR. The study does not exclude any hazardous materials or substances. The study includes all major raw material and energy consumption. All inputs and outputs of the unit processes, for which data is available for, are included in the calculation. There is no neglected unit process more than 1% of total mass or energy flows. The module specific total neglected input and output flows also do not exceed 5% of energy usage or mass. Cut off has been applied only in C1 to exclude fasteners.
LCI Method Principle
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
  • Independent external review by
License and access conditions
Copyright
yes
License type
Free of charge for all users and uses
Access information
None
Owner of data set
Peetri Puit OÜ
Technical purpose
Glulam is characterized by high load-bearing capacity, dimensional stability, and the ability to form timber parts into almost any shape (straight, curved, arched, tapered, etc.), allowing practically unlimited design freedom in timber construction. Glulam structures are made from technologically dried wood. The timber layers' necessary length is attained by finger-jointing, which allows us to produce structures of any length by gluing the layers together. Glulam use is broad. It can used for sports halls and leisure facilities, public and administrative buildings, industrial and production buildings, office buildings, etc. It is also the primary material for major load-bearing structures such as bridges, canopies, and pavilions. Glulam is well-suited to long span designs. For glulam production, we use spruce, pine, and larch. The moisture content of the using wood is typically 12 ± 2%. The material is visually sorted by quality. Glulam can be made visible and nonvisible quality.
Input Products
No records found.
Co-Products
No records found.
Data set version
00.03.000
Time stamp (last saved)
2025-08-13T08:43:22
Data set format
Compliance systems
  • EN 15804+A2 (Overall compliance: Fully compliant)
  • ISO 14025 (Overall compliance: Fully compliant)
  • ISO 21930 (Overall compliance: Fully compliant)
Tag
Registered in
Process is not registered in any registry
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.